Steadfast Process

1)Project Consultation A local CONTECH Bridge Solutions Project Consultant evaluates your needs.
2)Design The bridge is designed to meet all code, loading, and geometry requirements.
3)Fabrication - Our bridge fabrication shop has the space and equipment to handle even the toughest projects.
4)Transportation - Once the bridge is painted, it’s ready for delivery. Components are delivered to the job site on a flatbed truck.
5)Foundation/Abutments The bridge is attached to the abutments with anchor bolts.
6)Delivery When the bridge arrives, it is tagged with a number that correlates to the plans for easy erection.

 

7)Erection of Bridge Trusses are erected first. Once the first truss is connected to the abutment, the second is placed.

 

8)Decking and Flooring After the floor system is added, the bridge is ready to be opened.
9)Bridge Completion The finished truss bridge is economical, durable, and quickly open to traffic.